Kiora Hall, Stockton on Tees

Stockton Borough Council

Project Objective

Civil & Structural Engineering for Educational Refurbishment

Location

Stockton-on-Tees, UK

Value

TBC

Client

Stockton Borough Council

Scope of Work

Civil & Structural Engineering Services

Duration of Contract:

12 Months

Project Overview

Graham Schofield Associates (GSA) was appointed to provide full civil and structural engineering design services for the refurbishment of Kiora Hall — a circa 1902 building repurposed into a specialist educational setting. The project focused on modernising internal infrastructure while preserving the building’s historical significance and integrity.

Scope of Work

GSA’s role encompassed the structural reinforcement of the original framework and internal steel framing, along with the redevelopment of foundations, drainage, and access infrastructure suitable for a specialist educational setting.
Key Features
  • Structural Reinforcement – Strengthening and stabilisation of heritage elements to support adaptive reuse.
  • Education-Specific Access & Compliance – External works designed for accessibility, safety and flow of pupils and staff.
  • Drainage Strategy Integration – Designed to modern standards while respecting historic site constraints.

Challenges and Solutions

Preserving Heritage with Performance
GSA applied tailored detailing and minimal interventions to protect the building’s character while ensuring long-term structural safety.

Educational Standards & Accessibility
We worked to embed new circulation routes, access ramps and compliant entry points to meet modern educational facility requirements.

Outcome

Graham Schofield Associates (GSA) was appointed to provide full civil and structural engineering design services for the refurbishment of Kiora Hall — a circa 1902 building repurposed into a specialist educational setting. The project focused on modernising internal infrastructure while preserving the building’s historical significance and integrity.

Work With Us

Contact Us

From our origins to our present-day innovation, GSA remains committed to delivering exceptional engineering solutions that balance technical precision, sustainability, and client focus.

carbon footprint dan scatter hitam komoditas keberlanjutan yang diburu pasar

dari budaya pop ke bursa makna ekonomi di balik scatter hitam mahjong

digital payments dan scatter hitam mahjong momentum langka yang mengunci ekonomi regional

ihsg dan scatter hitam koreksi saham sebagai momentum langka pasar

intervensi bank indonesia dan scatter hitam menjawab krisis valas dengan strategi unik

pay later dan scatter hitam narasi kredit instan sebagai komoditas finansial baru

pencarian near me dan scatter hitam elektronik lokal sebagai alat finansial langka

rupiah terlemah sejak awal agustus scatter hitam dalam stabilitas mata uang

scatter hitam mahjong dan narasi kelangkaan membaca ulang nilai komoditas

scatter hitam mahjong simbol kelangkaan dalam ekonomi energi baru

darurat militer indonesia scatter hitam yang meningkatkan ketegangan publik

kwitang jakarta dan scatter hitam titik demo yang menggetarkan infrastruktur kota

live demo dan scatter hitam demo anti tunjangan parlemen yang mengguncang jalanan

manajemen bankroll saat scatter hitam lama tak muncul di mahjong ways

menggabungkan scatter hitam dengan wild tips kombinasi maksimal di mahjong ways

pola scatter hitam cara mengenali kombinasi simbol untuk jackpot mahjong ways

rumah eko patrio diserbu massa scatter hitam narasi politik di ruang pribadi

scatter hitam mahjong ways cara maksimalkan free spins dengan efisien

senayan bank jakarta halte baru sebagai scatter hitam branding perkotaan

strategi scatter hitam waktu tepat taruhan maksimal di mahjong ways