BESS Compound and Associated Enabling Works

Askam

Project Objective

Civil Engineering & Infrastructure Development

Location

UK

Value

£1.75 Million

Client

Askam

Scope of Work

Civil Engineering Services

Duration of Contract:

12 Months

Project Overview

Graham Schofield Associates (GSA) was appointed to provide civil engineering design and infrastructure solutions for the BESS Compound and associated enabling works. The project required a strategic approach to site development, integrating heavy-duty foundations, access roads, and drainage solutions to support the large-scale Battery Energy Storage System (BESS).

Scope of Work

GSA’s role encompassed detailed design of the reinforced concrete piled BESS unit and various ancillary unit bases, as well as the development of extensive site infrastructure, including access routes, bridge crossings, and multiple culverts.
Key Features
  • Reinforced Concrete Foundations: Ensuring structural integrity and longevity of the BESS units.
  • High-Capacity Access Roads & Bridge Crossings: Designed to support heavy transport and maintenance vehicles.
  • Drainage & Sitewide Infrastructure: Implementing water management solutions to mitigate surface water runoff and improve sustainability.

Challenges and Solutions

Heavy-Duty Structural Requirements: The compound needed engineered foundations capable of supporting substantial equipment loads—GSA designed deep reinforced concrete piles to ensure maximum stability.

Site Accessibility & Logistics: With multiple infrastructure elements, the project required a well-planned access strategy—GSA developed a comprehensive road layout and bridge crossing solutions to facilitate smooth transport movements.

Outcome

Graham Schofield Associates (GSA) was appointed to provide civil engineering design and infrastructure solutions for the BESS Compound and associated enabling works. The project required a strategic approach to site development, integrating heavy-duty foundations, access roads, and drainage solutions to support the large-scale Battery Energy Storage System (BESS).

Work With Us

Contact Us

From our origins to our present-day innovation, GSA remains committed to delivering exceptional engineering solutions that balance technical precision, sustainability, and client focus.

carbon footprint dan scatter hitam komoditas keberlanjutan yang diburu pasar

dari budaya pop ke bursa makna ekonomi di balik scatter hitam mahjong

digital payments dan scatter hitam mahjong momentum langka yang mengunci ekonomi regional

ihsg dan scatter hitam koreksi saham sebagai momentum langka pasar

intervensi bank indonesia dan scatter hitam menjawab krisis valas dengan strategi unik

pay later dan scatter hitam narasi kredit instan sebagai komoditas finansial baru

pencarian near me dan scatter hitam elektronik lokal sebagai alat finansial langka

rupiah terlemah sejak awal agustus scatter hitam dalam stabilitas mata uang

scatter hitam mahjong dan narasi kelangkaan membaca ulang nilai komoditas

scatter hitam mahjong simbol kelangkaan dalam ekonomi energi baru

darurat militer indonesia scatter hitam yang meningkatkan ketegangan publik

kwitang jakarta dan scatter hitam titik demo yang menggetarkan infrastruktur kota

live demo dan scatter hitam demo anti tunjangan parlemen yang mengguncang jalanan

manajemen bankroll saat scatter hitam lama tak muncul di mahjong ways

menggabungkan scatter hitam dengan wild tips kombinasi maksimal di mahjong ways

pola scatter hitam cara mengenali kombinasi simbol untuk jackpot mahjong ways

rumah eko patrio diserbu massa scatter hitam narasi politik di ruang pribadi

scatter hitam mahjong ways cara maksimalkan free spins dengan efisien

senayan bank jakarta halte baru sebagai scatter hitam branding perkotaan

strategi scatter hitam waktu tepat taruhan maksimal di mahjong ways