Dale Court, South Yorkshire
Northern Trust

Project Objective
Civil & Structural Engineering for Industrial Development
Location
South Yorkshire
Value
£3.25 Million
Client
Northern Trust
Scope of Work
Civil & Structural Engineering Services
Duration of Contract:
18 Months
Project Overview
Dale Court is a purpose-built industrial estate requiring high-performance civil and structural engineering solutions. GSA was appointed to deliver a fully integrated approach, ensuring efficient site infrastructure, structural resilience, and long-term durability for industrial operations.

Scope of Work
GSA provided full structural and site-wide engineering services, including drainage infrastructure, superstructure design, and highway integration through a Section 278 Agreement.
Key Features
- Steel Frame Industrial Units: Designed for flexibility in tenant usage while ensuring structural efficiency.
- Integrated Drainage & Flood Protection: GSA implemented high-capacity drainage solutions to mitigate flood risk.
- Optimised Site Layout: Industrial estates require strategic access and logistics planning—GSA ensured smooth transport flow and efficient use of space.
Challenges and Solutions
Site Constraints: GSA worked around existing infrastructure and access points, ensuring optimal land usage.
Regulatory Compliance: The project required adherence to local planning policies and industrial regulations—GSA’s expertise ensured seamless approvals.
Outcome
Dale Court is a purpose-built industrial estate requiring high-performance civil and structural engineering solutions. GSA was appointed to deliver a fully integrated approach, ensuring efficient site infrastructure, structural resilience, and long-term durability for industrial operations.