Dairy Farm Facility, Lancashire

WCK Farming

Project Objective

Civil Engineering & Structural Design for Modern Dairy Facility

Location

Lancashire

Value

£5 Million

Client

WCK Farming

Scope of Work

Civil Engineering & Drainage Solutions

Duration of Contract:

18 Months

Project Overview

GSA was commissioned to develop a modern Dairy Farm Facility, integrating structural and drainage engineering solutions to support long-term agricultural sustainability while ensuring operational resilience.

Scope of Work

GSA provided comprehensive substructure, superstructure, and drainage designs, ensuring the facility could withstand continuous heavy use while maintaining environmental compliance.

Key Features

  • Durable Structural Design: Steel-framed and reinforced concrete elements engineered for longevity and resilience.
  • Sustainable Drainage & Flood Mitigation: Implementation of Sustainable Urban Drainage Systems (SuDS) to manage water runoff efficiently.
  • Optimised Layout for Farm Operations: Ensuring efficient movement of livestock, machinery, and materials.

Challenges and Solutions

Managing Water & Waste Sustainably: GSA designed high-efficiency drainage systems to ensure environmental responsibility while reducing operational costs.

Adapting to Agricultural Demands: The facility was engineered to withstand heavy-duty agricultural operations while allowing for future expansion.

Outcome

GSA was commissioned to develop a modern Dairy Farm Facility, integrating structural and drainage engineering solutions to support long-term agricultural sustainability while ensuring operational resilience.

Work With Us

Contact Us

From our origins to our present-day innovation, GSA remains committed to delivering exceptional engineering solutions that balance technical precision, sustainability, and client focus.